CAISO interconnection queue: project map and status
Explore published generation and storage requests across the CAISO footprint. Compare requested MW, technology and project status, then open the queue map to investigate the grid around a county.

See it on the live CAISO map, updating as the market publishes.
Explore the CAISO queue mapAbout this view
Read the CAISO project list
The table uses CAISO's Public Queue Report, preserving project identifiers, requested capacity, technology, status and proposed completion dates where published. Active records appear before historical records, with larger requests first within each group.
Explore requested capacity by county
Open the CAISO queue map to compare counties and project technologies alongside transmission lines, substations and other grid layers. Project locations are represented at county level. Requested MW describes a connection request; it does not establish operating capacity or available grid headroom.
Questions
Is requested MW the same as operating capacity?
No. Queue capacity is the amount a project has requested to interconnect. It is not installed, operating, deliverability-assessed, or likely-to-complete capacity, and it does not establish available transmission headroom.
Where does this data come from?
CAISO's official Public Queue Report, the ISO's own published interconnection request listing. Ask the Grid mirrors each publication and stamps when the operator published it, so the snapshot you read is attributable to a specific CAISO release.
How precise is the project location shown?
The public report does not publish exact project geometry, so projects are joined to counties and map interactions are placed at county level. A named substation or point of interconnection is location evidence, not a feasibility measurement.
Will the map open with these layers?
Yes. It carries the same layers, filters, viewport, and timeline state shown on this page into the live CAISO workspace.