Data centers by utility: Oncor Ask the Grid profiles 26 data centers served by Oncor: 14 operating, 7 under construction, and 4 proposed or approved. The largest clusters are in Dallas (6), Lancaster (2), and Red Oak (2). The largest operators are DataBank (2) and Stream Data Centers (2).
profiled sites 26
operating 14
under construction 7
proposed or approved 4
Generation Data centers Storage Solar Wind Nuclear
Profiled facilities Ordered by reported MW
Browse by state or province 1
Development status
Approved 1
Expanding 2
Operating 12
Proposed 3
Under Construction 7
Unknown 1 Sources and coverage The inventory contains published facility, campus, building, and phase records. Power figures describe the exact asset, including a campus record's own campus capacity, and retain their basis, scope, status, and date. Records at different scopes are not additive, and a published project does not establish an operating load.
Geographic directories use the state and city recorded for each asset. Organization groups preserve published names and roles. Utility groups use the utility named in the facility record; individual profiles distinguish service agreements from service-territory matches. Each profile carries the sources and dates behind its facts.
Aligned DFW-03 Data Center Aligned Data Centers · Facility profile · Mansfield, TX
Mansfield, TX ERCOT
Operating
Not disclosed No exact-asset power figure · facility
Amazon Web Services Facility profile · Euless, TX Euless, TX ERCOT
Unknown
Not disclosed No exact-asset power figure · facility
Charles Schwab Data Center Facility profile · Denton, TX Denton, TX ERCOT
Operating
Not disclosed No exact-asset power figure · building
Cipher Digital Black Pearl Data Center Cipher Digital Inc. · Facility profile · Wink, TX Wink, TX ERCOT
Under Construction
216 MW Critical IT Load · Contracted · campus
Cipher Digital Stingray Cipher Digital · Facility profile · Andrews, TX Andrews, TX ERCOT
Under Construction
100 MW Capacity basis unspecified · Reported · facility
Compass Red Oak Campus Compass Datacenters · Facility profile · Red Oak, TX Red Oak, TX ERCOT
Expanding
180 MW Energized Power · Operating · campus
DataBank Red Oak Data Center Campus DataBank · Facility profile · Red Oak, TX Red Oak, TX ERCOT
Under Construction
480 MW Critical IT Load · Proposed · campus
DFW01-01 Prime Data Centers · Facility profile · Dallas, TX Dallas, TX ERCOT
Operating
8 MW Critical IT Load · Operating · facility
DFW36 Data Center Digital Realty · Facility profile · Dallas, TX Dallas, TX ERCOT
Operating
Not disclosed No exact-asset power figure · building
Downtown Dallas Data Center (DFW1) DataBank · Facility profile · Dallas, TX Dallas, TX ERCOT
Operating
7 MW Critical IT Load · Operating · facility
Edged Project Outpost Data Center Campus EDC Fort Worth LLC · Facility profile · Fort Worth, TX Fort Worth, TX ERCOT
Proposed
196 MW Capacity basis unspecified · Proposed · campus
Equinix Infomart Equinix · Facility profile · Dallas, TX Dallas, TX ERCOT
Operating
Not disclosed No exact-asset power figure · building
H5 COLO Dallas H5 COLO · Facility profile · Dallas, TX Dallas, TX ERCOT
Operating
17 MW Utility Service · Reported · facility
Mesones Prime Data Center Campus Prominent Property Group · Facility profile · Jarrell, TX Jarrell, TX ERCOT
Proposed
About 264 MW Capacity basis unspecified · Target · campus
Meta Fort Worth Data Center Meta · Facility profile · TX TX ERCOT
Operating
Not disclosed No exact-asset power figure · building
NTT Lancaster TX10 Data Center Campus (Project Orange) NTT Global Data Centers Americas, Inc. · Facility profile · Lancaster, TX Lancaster, TX ERCOT
Approved
252 MW Capacity basis unspecified · Proposed · campus
PowerHouse Grand Prairie Data Center Campus Prairie Ridge Phase 1 Owner LP · Facility profile · Midlothian, TX Midlothian, TX ERCOT
Proposed
Up to 1,800 MW Utility Service · Proposed · campus
PowerHouse Irving Data Center Campus PowerHouse Data Centers · Facility profile · Irving, TX Irving, TX ERCOT
Under Construction
Up to 201 MW Utility Service · Proposed · campus
Riot Rockdale Riot Platforms, Inc. · Facility profile · Thorndale, TX Thorndale, TX ERCOT
Operating
345 MW Contracted Power · Contracted · campus · 2025-12-31
Rowan Project Stampede Data Center Campus Rowan Digital Infrastructure · Facility profile · Temple, TX Temple, TX ERCOT
Under Construction
300 MW Capacity basis unspecified · Reported · campus
Rowan Project Temple Data Center Campus Rowan · Facility profile · Temple, TX Temple, TX ERCOT
Under Construction
300 MW Capacity basis unspecified · Under Construction · campus
STACK Infrastructure DFW02 Data Center Campus STACK Infrastructure · Facility profile · Lancaster, TX Lancaster, TX ERCOT
Under Construction
Up to 504 MW Critical IT Load · Proposed · campus
Stream Data Centers DFWA Stream Data Centers · Facility profile · Garland, TX Garland, TX ERCOT
Operating
43 MW Critical IT Load · Reported · facility · DFWA1
Stream DFW IV Stream Data Centers · Facility profile · Richardson, TX Richardson, TX ERCOT
Operating
1.68 MW Critical IT Load · Reported · facility
Switch The Rock Campus Switch, Inc. · Facility profile · Round Rock, TX Round Rock, TX ERCOT
Expanding
185 MW Campus Gross Power · Target · campus · 2021-06-02