PJM interconnection queue: projects and outcomes
Explore PJM generation and storage requests in one dated publication. Browse project records, compare known requested MW and outcomes by entry year, and inspect completion times before opening the queue map.

See it on the live PJM map, updating as the market publishes.
Explore the PJM queue mapAbout this view
Read the PJM project list
The table uses PJM's New Services Queue, preserving project identifiers, requested capacity, technology, status and proposed completion dates where published. Active records appear before historical records, with larger requests first within each group.
Explore requested capacity by county
Open the PJM queue map to compare counties and project technologies alongside transmission lines, substations and other grid layers. Project locations are represented at county level. Requested MW describes a connection request; it does not establish operating capacity or available grid headroom.
One record per project
Every cohort uses a single published snapshot, grouped by the project's queue-entry year. Requested MW describes the interconnection request. The record's current status determines the outcome shown.
Time to service
The median includes fully In Service projects with a valid actual completion date on or after their entry date and on or before the selected date. The table shows the number with usable dates. Partial service, suspended, deactivated and pending-termination projects remain in Other. Active, Confirmed, Engineering and Procurement, and Under Construction are shown as Active development.
Reading the comparison
The comparison counts changes in listed statuses between the selected snapshot and the latest available snapshot on or before 30 days earlier. Corrections and reclassifications can affect those counts. Entry-cohort outcomes describe the selected posting; newer cohorts have had less time to progress.
Questions
Is requested MW the same as operating capacity?
No. Queue capacity is the amount a project has requested to interconnect. It is not installed, operating, or likely-to-complete capacity, and it does not establish available transmission headroom at the named point of interconnection.
Where does this data come from?
PJM's official new services queue publication. Ask the Grid mirrors each release and stamps when the operator published it, so every row is attributable to a specific PJM publication.
How precise is the project location shown?
The public queue does not publish exact project geometry, so projects are joined to counties and map interactions are placed at county level. A named substation or transmission owner is location evidence, not a feasibility measurement.
Will the map open with these layers?
Yes. It carries the same layers, filters, viewport, and timeline state shown on this page into the live PJM workspace.
Which statuses count as withdrawn?
Withdrawn, Retracted, Canceled and Annulled. Only In Service counts as fully in service. Active, Confirmed, Engineering and Procurement, and Under Construction are grouped as Active development. Remaining published statuses, including partial service, suspended, deactivated and pending termination, are grouped as Other. The full source-status table preserves each status.
Is this a historical archive of every PJM posting?
The date selector uses retained snapshots. Older queue-entry and completion dates are project attributes in those postings. The snapshot timestamp identifies exactly which publication the cohorts describe.
Does the in-service share predict whether a new project will be built?
It describes the fraction of a selected entry cohort listed as fully in service in that snapshot. Cohorts differ in age, technology and market conditions, so the share is descriptive.