Large electricity users in Texas Explore data centers and published industrial facilities, with development status, disclosed power requirements, and source-backed grid context.
records 230
named organizations 127
states / provinces 1 Generation Data centers Storage Solar Wind NuclearStream Data Centers 5 large electricity users
Microsoft Lambda Drive Datacenter Campus Microsoft · Facility profile · San Antonio, TX
San Antonio, TX ERCOT
Operating
Not disclosed No exact-asset power figure · campus
Microsoft San Antonio SN1 and SN2 Data Center Facility profile · San Antonio, TX San Antonio, TX ERCOT
Operating
Not disclosed No exact-asset power figure · facility
Microsoft SAT14 Data Center Microsoft · Facility profile · San Antonio, TX San Antonio, TX ERCOT
Unknown
Not disclosed No exact-asset power figure · facility
Motiva Port Arthur Refinery Motiva Enterprises, LLC · Facility profile · Port Arthur, TX Port Arthur, TX MISO
Operating
See profile Industrial facility
Natgasoline LLC (Beaumont methanol plant) Facility profile · Beaumont, TX Beaumont, TX MISO
Operating
See profile Industrial facility
Netrality Houston 1301 Fannin Netrality · Facility profile · Houston, TX Houston, TX ERCOT
Operating
26 MW Utility Service · Reported · building · 2026-03-02
Nexus Data Center Hubbard Nexus Hubbard Power, LLC · Facility profile · Hubbard, TX Hubbard, TX ERCOT
Under Construction
About 7,700 MW Capacity basis unspecified · Proposed · campus
Nscale Ward County Data Center Nscale · Facility profile · Barstow, TX Barstow, TX ERCOT
Operating
234 MW Capacity basis unspecified · Reported · facility · 2025-10-14
NTT Garland Campus NTT DATA · Facility profile · Garland, TX Garland, TX ERCOT
Operating
Not disclosed No exact-asset power figure · campus
NTT Lancaster TX10 Data Center Campus (Project Orange) NTT Global Data Centers Americas, Inc. · Facility profile · Lancaster, TX Lancaster, TX ERCOT
Approved
252 MW Capacity basis unspecified · Proposed · campus
Nucor Steel Texas (Jewett) Facility profile · Jewett, TX Jewett, TX ERCOT
Operating
See profile Industrial facility
NXP Semiconductors - EB site Facility profile · Austin, TX Austin, TX ERCOT
Operating
See profile Industrial facility
Olin Freeport Facility profile · Freeport, TX Freeport, TX ERCOT
Operating
See profile Industrial facility
Oppidan Connect Temple Data Center Oppidan · Facility profile · Temple, TX Temple, TX ERCOT
Under Construction
14 MW Contracted Power · Contracted · facility
Oppidan El Paso 5MW Data Center Oppidan · Facility profile · El Paso, TX El Paso, TX Grid context in profile
Under Construction
5 MW Capacity basis unspecified · Proposed · building
Optimus Steel Beaumont Facility profile · Vidor, TX Vidor, TX MISO
Operating
See profile Industrial facility
Orion Engineered Carbons Borger Plant Facility profile · Borger, TX Borger, TX SPP
Operating
See profile Industrial facility
Oxy Vinyls La Porte VCM Plant Oxy Vinyls, LP · Facility profile · La Porte, TX La Porte, TX ERCOT
Operating
See profile Industrial facility
OxyChem Dallas Silicate Plant Occidental Chemical Corporation · Facility profile · Dallas, TX Dallas, TX ERCOT
Operating
See profile Industrial facility
OxyChem Ingleside Plant Facility profile · Ingleside, TX Ingleside, TX ERCOT
Operating
See profile Industrial facility
PEMEX Deer Park Refinery Facility profile · Deer Park, TX Deer Park, TX ERCOT
Operating
See profile Industrial facility
Phelps Dodge Refining El Paso Refinery and Rod Plant Phelps Dodge Refining Corporation · Facility profile · El Paso, TX El Paso, TX Grid context in profile
Operating
See profile Industrial facility
Phillips 66 Sweeny Refinery Facility profile · Old Ocean, TX Old Ocean, TX ERCOT
Operating
See profile Industrial facility
Poolside Project Horizon Data Center Campus Poolside, Inc · Facility profile · Pecos, TX Pecos, TX ERCOT
Proposed
7,000+ MW Capacity basis unspecified · Reported · campus
PowerHouse Grand Prairie Data Center Campus Prairie Ridge Phase 1 Owner LP · Facility profile · Midlothian, TX Midlothian, TX ERCOT
Proposed
Up to 1,800 MW Utility Service · Proposed · campus
PowerHouse Irving Data Center Campus PowerHouse Data Centers · Facility profile · Irving, TX Irving, TX ERCOT
Under Construction
Up to 201 MW Utility Service · Proposed · campus
QTS Fort Worth 1 Quality Technology Services (QTS) · Facility profile · Fort Worth, TX Fort Worth, TX ERCOT
Expanding
70 MW Critical IT Load · Reported · campus
QTS Irving 1 QTS · Facility profile · Irving, TX Irving, TX ERCOT
Unknown
Not disclosed No exact-asset power figure · campus
QTS San Antonio 2 Data Center Campus Quality Technology Services (QTS) · Facility profile · San Antonio, TX San Antonio, TX ERCOT
Operating
27.6 MW Critical IT Load · Operating · campus · 2021-01-01
Raeden Jacinto City Inference Data Center IRGRA · Facility profile · Houston, TX Houston, TX ERCOT
Proposed
50 MW Capacity basis unspecified · Proposed · campus
Rice Data Center William Marsh Rice University · Facility profile · Houston, TX Houston, TX ERCOT
Operating
Not disclosed No exact-asset power figure · facility
Rio Grande LNG Facility profile · Port Isabel, TX Port Isabel, TX ERCOT
Under construction
See profile Industrial facility
Riot Platforms Corsicana Campus Riot Platforms · Facility profile · Corsicana, TX Corsicana, TX ERCOT
Expanding
1,000 MW Capacity basis unspecified · Reported · campus
Riot Rockdale Riot Platforms, Inc. · Facility profile · Thorndale, TX Thorndale, TX ERCOT
Operating
345 MW Contracted Power · Contracted · campus · 2025-12-31
Rowan Project Cinco Data Center Campus Rowan Cinco LLC · Facility profile · Medina, TX Medina, TX ERCOT
Under Construction
300 MW Capacity basis unspecified · Under Construction · campus
Rowan Project Stampede Data Center Campus Rowan Digital Infrastructure · Facility profile · Temple, TX Temple, TX ERCOT
Under Construction
300 MW Capacity basis unspecified · Reported · campus
Rowan Project Temple Data Center Campus Rowan · Facility profile · Temple, TX Temple, TX ERCOT
Under Construction
300 MW Capacity basis unspecified · Under Construction · campus
Sabey San Marcos Data Center Campus Sabey Data Centers · Facility profile · San Marcos, TX San Marcos, TX ERCOT
Proposed
Not disclosed No exact-asset power figure · campus
Samsung Austin Semiconductor Facility profile · Austin, TX Austin, TX ERCOT
Operating
See profile Industrial facility
SAT82 Data Center Microsoft · Facility profile · San Antonio, TX San Antonio, TX ERCOT
Approved
Not disclosed No exact-asset power figure · building
SB Energy Cosmos Technology Campus (HighPoint 2222) Facility profile · Austin, TX Austin, TX ERCOT
Under Construction
About 50 MW Critical IT Load · Under Construction · campus
SB Energy Milam Data Center Campus SB Energy · Facility profile · Burlington, TX Burlington, TX ERCOT
Under Construction
About 753 MW Critical IT Load · Under Construction · campus
SDC Austin Sabey Data Centers · Facility profile · Round Rock, TX Round Rock, TX ERCOT
Under Construction
84 MW Critical IT Load · Reported · campus
Skybox Hutto 2 (Building 2) Hutto Data Center Campus, LLC · Facility profile · Hutto, TX Hutto, TX ERCOT
Under Construction
Not disclosed No exact-asset power figure · building
Skybox PowerCampus Dallas Data Center Google · Facility profile · Lancaster, TX Lancaster, TX ERCOT
Under Construction
Up to 300 MW Campus Gross Power · Proposed · campus
SkyWater Fab 25 (formerly Cypress Semiconductor), Austin SkyWater Technology · Facility profile · Austin, TX Austin, TX ERCOT
Operating
See profile Industrial facility
STACK Infrastructure DFW02 Data Center Campus STACK Infrastructure · Facility profile · Lancaster, TX Lancaster, TX ERCOT
Under Construction
Up to 504 MW Critical IT Load · Proposed · campus
Stargate 1 Crusoe · Facility profile · Abilene, TX Abilene, TX ERCOT
Expanding
1,200 MW Interconnection Request · Approved · campus · Full campus · 2025-03-18
Stream Data Centers DFWA Stream Data Centers · Facility profile · Garland, TX Garland, TX ERCOT
Operating
43 MW Critical IT Load · Reported · facility · DFWA1
7 profiles
7
Development status
Approved 7
Closed 1
Expanding 9
Operating 155
Planned 2
Proposed 16
Under construction 1
Under Construction 29
Unknown 10 Sources and coverage Large-load records describe individual facilities and development scopes. Requested, contracted, planned, and operating power are distinct measures; figures at different scopes are not additive.
Geographic directories use the state and city recorded for each asset. Organization groups preserve published names and roles. Utility groups use the utility named in the facility record; individual profiles distinguish service agreements from service-territory matches. Each profile carries the sources and dates behind its facts.