Appearance Dark Light Data Center Database: Locations, Operators & Power · Page 19 · Ask the Grid
TierPoint 31 data centers
Serverfarm TiTAN Moses Lake Data Center Serverfarm · Facility profile · Moses Lake, WA
Moses Lake, WA Grant County PUD
Operating
22 MW Capacity basis unspecified · Reported · facility
Skybox Chicago I Skybox Datacenters · Facility profile · Elk Grove Village, IL Elk Grove Village, IL PJM
Unknown
Not disclosed No exact-asset power figure · facility
Skybox Hutto 2 (Building 2) Hutto Data Center Campus, LLC · Facility profile · Hutto, TX Hutto, TX ERCOT
Under Construction
Not disclosed No exact-asset power figure · building
Skybox PowerCampus Dallas Data Center Google · Facility profile · Lancaster, TX Lancaster, TX ERCOT
Under Construction
Up to 300 MW Campus Gross Power · Proposed · campus
Slate Belt Holdings Slate Belt Technology Campus (River Pointe Data Center Campus) Bangor Area Commercial and Industrial Development Authority · Facility profile · Upper Mount Bethel Township, PA Upper Mount Bethel Township, PA PJM
Proposed
1,020 MW Contracted Power · Contracted · campus
Social Circle Technology Park Data Center Campus SC Infrastructure · Facility profile · Social Circle, GA Social Circle, GA Grid context in profile
Approved
Not disclosed No exact-asset power figure · campus
Spalding Investments Spalding County Data Center Campus Spalding Investments, LLC · Facility profile · Griffin, GA Griffin, GA Georgia Power
Approved
Not disclosed No exact-asset power figure · campus
STACK Infrastructure DFW02 Data Center Campus STACK Infrastructure · Facility profile · Lancaster, TX Lancaster, TX ERCOT
Under Construction
Up to 504 MW Critical IT Load · Proposed · campus
STACK Infrastructure Fredericksburg Technology Overlay District Data Center Campus CVAS P8A, LLC · Facility profile · Fredericksburg, VA Fredericksburg, VA PJM
Proposed
Not disclosed No exact-asset power figure · campus
STACK Infrastructure SVY01 STACK Infrastructure · Facility profile · San Jose, CA San Jose, CA CAISO
Expanding
60 MW Capacity basis unspecified · Reported · campus · Expansion
STACK New Albany NAL01 Campus STACK Infrastructure · Facility profile · New Albany, OH New Albany, OH PJM
Unknown
60 MW Critical IT Load · Reported · campus
STACK POR03 Hillsboro Campus STACK Infrastructure · Facility profile · Hillsboro, OR Hillsboro, OR Portland General Electric
Operating
200 MW Capacity basis unspecified · Reported · campus
STACK Santa Clara SVY02A STACK Infrastructure · Facility profile · Santa Clara, CA Santa Clara, CA CAISO
Unknown
Not disclosed No exact-asset power figure · building
STACK Stafford Technology Campus STACK Infrastructure · Facility profile · Stafford, VA Stafford, VA PJM
Under Construction
300 MW Utility Service · Proposed · campus
Stargate 1 Crusoe · Facility profile · Abilene, TX Abilene, TX ERCOT
Expanding
1,200 MW Interconnection Request · Approved · campus · Full campus · 2025-03-18
Starwood Plaza 500 Data Center PLAZA 500 PROPERTY OWNER LP · Facility profile · Alexandria, VA Alexandria, VA PJM
Proposed
Not disclosed No exact-asset power figure · campus
Stream Chicago I Stream Data Centers · Facility profile · Elk Grove Village, IL Elk Grove Village, IL PJM
Operating
Not disclosed No exact-asset power figure · facility
Stream Chicago II Stream Data Centers · Facility profile · Elk Grove Village, IL Elk Grove Village, IL PJM
Unknown
32 MW Critical IT Load · Reported · building
Stream Data Centers Atlanta West Data Center Campus SDC ATLA, LLC · Facility profile · Winston, GA Winston, GA Georgia Power
Approved
Up to 280 MW Utility Service · Target · campus
Stream Data Centers DFWA Stream Data Centers · Facility profile · Garland, TX Garland, TX ERCOT
Operating
43 MW Critical IT Load · Reported · facility · DFWA1
Stream Data Centers Phoenix PHXA Stream Data Centers · Facility profile · Goodyear, AZ Goodyear, AZ Arizona Public Service
Operating
280 MW Critical IT Load · Target · campus
Stream Data Centers San Antonio II (SATA1) Stream Data Centers · Facility profile · San Antonio, TX San Antonio, TX ERCOT
Operating
Not disclosed No exact-asset power figure · campus
Stream Data Centers San Antonio III Data Center Campus SDC SA III, L.P. · Facility profile · San Antonio, TX San Antonio, TX ERCOT
Operating
Up to 200 MW Critical IT Load · Proposed · campus
Stream Data Centers Wilmer I (DFW B) Data Center Campus Stream Data Centers · Facility profile · Wilmer, TX Wilmer, TX ERCOT
Operating
90 MW Critical IT Load · Proposed · campus
Stream DFW IV Stream Data Centers · Facility profile · Richardson, TX Richardson, TX ERCOT
Operating
1.68 MW Critical IT Load · Reported · facility
Stream DFW V Stream Data Centers · Facility profile · Richardson, TX Richardson, TX ERCOT
Operating
3.6 MW Critical IT Load · Reported · building
Stream ORDC (Chicago III) Stream Data Centers · Facility profile · Elk Grove Village, IL Elk Grove Village, IL PJM
Proposed
Not disclosed No exact-asset power figure · campus
Switch KEEP 2.0 Atlanta North Campus Data Center Switch · Facility profile · Cartersville, GA Cartersville, GA Central Georgia EMC
Under Construction
1,200 MW Utility Service · Reported · campus
Switch NAP4 Data Center, Las Vegas Switch Communications Group L.L.C. · Facility profile · Las Vegas, NV Las Vegas, NV Grid context in profile
Operating
Not disclosed No exact-asset power figure · campus
Switch Pittsburgh Pit Race Data Center Campus Switch · Facility profile · Big Beaver, PA Big Beaver, PA PJM
Proposed
Not disclosed No exact-asset power figure · campus
Switch Tahoe Reno Citadel Campus Switch · Facility profile · McCarran, NV McCarran, NV NV Energy
Operating
5 MW Contracted Power · Contracted · campus
Switch The Core Campus Switch · Facility profile · Las Vegas, NV Las Vegas, NV Grid context in profile
Operating
Not disclosed No exact-asset power figure · campus
Switch The Rock Campus Switch, Inc. · Facility profile · Round Rock, TX Round Rock, TX ERCOT
Expanding
185 MW Campus Gross Power · Target · campus · 2021-06-02
T5 Chicago II T5 Data Centers · Facility profile · Elk Grove Village, IL Elk Grove Village, IL PJM
Unknown
Not disclosed No exact-asset power figure · facility
T5@Charlotte T5 · Facility profile · Kings Mountain, NC Kings Mountain, NC Grid context in profile
Operating
Not disclosed No exact-asset power figure · facility
T5@Portland T5 · Facility profile · Hillsboro, OR Hillsboro, OR Portland General Electric
Operating
Not disclosed No exact-asset power figure · campus
T5@Silicon Valley Facility profile · Newark, CA Newark, CA CAISO
Operating
Not disclosed No exact-asset power figure · campus
TA Digital Group ATL02 Ellenwood Data Center TA Ellenwood LLC · Facility profile · Ellenwood, GA Ellenwood, GA Georgia Power
Approved
200 MW Capacity basis unspecified · Reported · campus
TA Digital Group ATL03 Data Center Campus TA Realty LLC · Facility profile · Union City, GA Union City, GA Georgia Power
Proposed
300 MW Capacity basis unspecified · Proposed · campus
TECfusions Clarksville Data Center Campus TECfusions · Facility profile · Clarksville, VA Clarksville, VA PJM
Operating
37 MW Energized Power · Energized · campus
TECfusions Keystone Connect Data Center Campus TECfusions · Facility profile · New Kensington, PA New Kensington, PA PJM
Operating
3,000 MW Critical IT Load · Proposed · campus
TeraWulf Chesapeake Data Campus TeraWulf · Facility profile · Newburg, MD Newburg, MD PJM
Permitting
800 MW Critical IT Load · Reported · campus
TeraWulf Justified Data Campus TeraWulf · Facility profile · Hawesville, KY Hawesville, KY MISO
Permitting
401 MW Critical IT Load · Contracted · campus
TeraWulf Lake Hawkeye Data Facility profile · Lansing, NY Lansing, NY NYISO
Permitting
320 MW Critical IT Load · Reported · campus
TeraWulf Lake Mariner Data Campus TeraWulf · Facility profile · Barker, NY Barker, NY NYISO
Operating
438 MW Critical IT Load · Reported · campus
Texas Cryptologic Center National Security Agency · Facility profile · San Antonio, TX San Antonio, TX ERCOT
Operating
40 MW Campus Gross Power · Operating · facility
The Springdale Dynamo Data Center Campus Allegheny DC Propco LLC · Facility profile · Springdale, PA Springdale, PA PJM
Proposed
About 350 MW Campus Gross Power · Proposed · campus
Thin-nology Data Center Thin-nology · Facility profile · Pflugerville, TX Pflugerville, TX ERCOT
Operating
2 MW Utility Service · Reported · facility · 2024-10-03
Thornberry Data Center Campus Thornberry, LLC · Facility profile · Ruther Glen, VA Ruther Glen, VA PJM
Proposed
Not disclosed No exact-asset power figure · campus
Arizona 30 data centers Colorado 20 data centers Florida 15 data centers Georgia 59 data centers Indiana 7 data centers Kansas 4 data centers Maine: no data centers Massachusetts 14 data centers Minnesota 11 data centers New Jersey 30 data centers North Carolina 15 data centers North Dakota 3 data centers Oklahoma 3 data centers Pennsylvania 36 data centers South Dakota: 1 data centers Texas 174 data centers Wyoming 3 data centers Connecticut: 2 data centers Missouri 8 data centers West Virginia: no data centers Illinois 48 data centers New Mexico 3 data centers Arkansas: 1 data centers California 77 data centers Delaware: no data centers District of Columbia: 2 data centers Hawaii: no data centers Iowa 12 data centers Kentucky 4 data centers Maryland 7 data centers Michigan 6 data centers Mississippi: 1 data centers Montana: no data centers New Hampshire: no data centers New York 23 data centers Ohio 42 data centers Oregon 19 data centers Tennessee 14 data centers Utah 18 data centers Virginia 249 data centers Washington 20 data centers Wisconsin 4 data centers Nebraska 5 data centers South Carolina 4 data centers Idaho: 1 data centers Nevada 7 data centers Vermont: no data centers Louisiana: 2 data centers Rhode Island: no data centers
Browse by state or province 35
Development status
Approved 45
Closed 1
Expanding 20
Operating 702
Paused 1
Permitting 5
Proposed 73
Under Construction 109
Unknown 56 Sources and coverage The inventory contains published facility, campus, building, and phase records. Power figures describe the exact asset, including a campus record's own campus capacity, and retain their basis, scope, status, and date. Records at different scopes are not additive, and a published project does not establish an operating load.
Geographic directories use the state and city recorded for each asset. Organization groups preserve published names and roles. Utility groups use the utility named in the facility record; individual profiles distinguish service agreements from service-territory matches. Each profile carries the sources and dates behind its facts.